I. Site Preparation / Improvements
• Silt Fence
• Excavation
• Backfilling of soil or gravel
• Foundation
II. Rough Construction
• Framing of structure and roofing
• Window Installation
• Placement of gutters and downspouts
• Rough HVAC walk through, to determine
the placement of mechanical fixtures
III. Electrical / Plumbing
• Rough plumbing walk through to determine
the placement of sinks and faucets
• Rough electrical walk through to determine
the location of lights and switches
IV. Drywall / Hardwood Floors
• Drywall is hung, taped, and sanded
• Flooring installed -unfinished
V. Finish Carpentry
• Installation of trim and cabinets
VI. Finishing
• Staining of millwork and cabinetry
• Painting of Walls
• Installation of countertops
• Installation of plumbing fixtures
• Installation of Carpet
• Final Cleaning
V. Interior Decorating
• Choosing colors, textures, furniture, art |